-
ANALISA TEKNIS & BIAYA PERALATAN |
URAIAN ANALISA ALAT
Jenis Alat : Bulldozer Kode Alat
| ||||||
---|---|---|---|---|---|---|
No . | Uraian | kode | Koef | Sat | Ket | |
A. | URAIAN PERALATAN | |||||
1 | Jenis Peralatan | BULLDOZER D85 | ||||
2
3
4 5 B. 1 2 3 C. 1 2 3 4 5 | Tenaga Kapasitas Kondisi Alat a. Umur Ekonomis b. Jam Kerja/Tahun c. Harga Alat Alat di pakai a. Umur Ekonomis b. Jam Kerja/Tahun c. Harga Alat (*) BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10%xB Faktor Angsuran Modal = ix(1+i)^A' (1+i)^A'-1 Biaya Pasti Per Jam : a.Biaya Pengembalian Modal (B'-C)xD W b.Asuransi dll = 0,002 x B' W' Biaya Pasti Per Jam = ( E + F ) BIAYA OPERASIONAL PER JAM Bahan Bakar : (0,125-0,175 Ltr/HP/Jam)*Pw*Ms Pelumas : (0,01-0,02 Ltr/HP/Jam)*Pw*Mp Perawatan & Perbaikan : (12,5%-17,5%)*B W' Operator : (1 Org/Jam)*U1 Pemb. Operator : (1 Org/Jam)*U2 Biaya Operasi per Jam = (H+I+K+L+M) |
Pw Cp A W
B
A'
W'
B' C D E F G H I K L M P
| 174,0 8,000 5,000 2000 975.000.000 4,000 1.600,00 780.000.000 97.500.000 0,320 134.586,01 975,00 135.543,01 250.125,00 49.590,00 60.937,50 21.428,57 - 382.081,07 | HP Ton Tahun Jam Rupiah Tahun Jam Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah Rupiah | - | |
D. | TOTAL BIAYA SEWA ALAT/JAM = (G+P) | S | 517.624,09 | Rupiah | | |
E. 1 2 3 4 5 6 7 | LAIN-LAIN
Tingkat Suku Bunga
Upah Operator/Sopir Upah Pembantu Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPn | i
U1
U2 Mb Ms Mp - | 10,00
21.428,57
- 9.000,00 11.500,00 28.000,00 | %
Rp/Jam
Rp/Jam Liter Liter Liter | ||
Unduh File Format Exls